House Rewiring: What We Actually Do

A rewire replaces the wiring running through your home's walls, ceiling and floor with new cable rated to current standards. Depending on the property, that covers:

  • Full house rewiring, every circuit brought up to current standard
  • Partial rewiring, targeting specific rooms or circuits that need it most
  • Cloth and rubber-insulated cable replacement, common in older housing
  • Breaking one overloaded circuit into several properly sized ones
  • New switchboard integration, since a rewire and a board upgrade usually go together
  • Certificate of Compliance, lodged once the work is tested and finished

Cable routes are planned to keep wall and ceiling disruption as light as it can be, with a clean patch anywhere we do need to open something up.

Every rewire finishes with full testing on every circuit before we consider the job done. That includes insulation resistance testing, not just confirming the lights turn on.

Data cabling being terminated in a comms enclosure

When It Is Time for House Rewiring

Choosing a full rewire over another patch-up repair comes down to a handful of tell-tale signs.

  • Your home still has cloth, rubber or VIR-insulated wiring from decades ago
  • Multiple circuits trip regularly, not just one isolated fault
  • You're renovating and the walls are already open, making this the moment to act
  • An inspection or insurer report calls out the wiring as a concern
  • The switchboard still can't cope with modern loads, even after an upgrade
  • You've had repeated repair call-outs for what keeps turning out to be ageing wiring

An unexplained electrical burning smell often traces back to deteriorated wiring rather than a single isolated fault.

Call (02) 9538 7444
Electrician working on the wiring inside a switchboard

House Rewiring in Ashfield Homes

A rewire in Ashfield usually comes down to timing rather than surprise. Owners renovating a period home here tend to discover the state of the wiring once a wall or ceiling is already open, and that's the moment to do the whole job properly rather than patch around what's exposed.

Working around existing plaster, cornices and other period detail takes more planning than a modern home would need, but it's entirely achievable without losing the character that made the house worth buying in the first place.

Strata blocks bring a different version of the same decision. A common-property board upgrade sometimes prompts individual owners to rewire their own unit at the same time, since the disruption of opening walls is already underway for the building.

Call (02) 9538 7444
Wall plate wiring being repaired with a screwdriver

Renovation Timing for a Rewire

The best time to rewire is before walls close back up, not after. Once plaster, tiling and paint are finished, running new cable means undoing all of it.

If a renovation is on the cards, having wiring assessed at the planning stage means the electrical work fits around the build rather than fighting it afterward. A look at framing stage, before the walls close up, costs nothing and heads off guesswork later.

Where a renovation is only touching one or two rooms, a partial rewire targeting just those areas is often the more sensible call than opening up the whole house.

Call (02) 9538 7444
Data cabling being terminated in a comms enclosure

House Rewiring Pricing: What Moves the Quote

You'll have a written number in hand once we've assessed the property, agreed before any cable comes out. What affects that number:

  • Full versus partial rewire, since scope changes the job significantly
  • Property size and number of circuits involved
  • Access, including wall cavities, roof space and how much patching is needed
  • Existing wiring condition, if it's more deteriorated than first expected
  • Switchboard work, where a board upgrade is bundled with the rewire

Quoting is free, and your first service with us comes with $50 off.

Electrician working on the wiring inside a switchboard

How the Job Runs and How Long It Takes

Rewiring is planned work, done properly rather than rushed.

  1. We assess the property and scope exactly what needs replacing.
  2. The full-job price lands with you in writing before we lift a single floorboard.
  3. We run new cable and remove the old, working room by room.
  4. We test everything and lodge compliance paperwork once it's finished.

A partial rewire can be done in a day or two. A full house rewire typically runs several days to a week or more, depending on size and access.

Call (02) 9538 7444
Wall plate wiring being repaired with a screwdriver

The Rules That Apply in NSW

Rewiring counts as notifiable work in NSW, which means a Certificate of Compliance gets lodged with Fair Trading once we're done. Every rewire meets AS/NZS 3000, the standard behind cable type, circuit protection and safety switch placement.

Tackling a rewire yourself isn't a legal option in NSW, whatever your comfort level with tools. The scale of the work, and what's at stake if a connection is wrong, is exactly why this stays licensed-only.

Where old wiring lacks safety switches, a rewire is the natural point to add them across every circuit rather than retrofitting later.

Data cabling being terminated in a comms enclosure

What Usually Gets Bundled With a Rewire

Once walls are open for a rewire, a handful of other jobs make sense to add on rather than book separately later.

  • Switchboard upgrade, since new wiring needs a board that can handle it properly
  • Extra power points, added wherever the new layout calls for them
  • Data and comms cabling, run alongside the electrical while access is easy
  • Smoke alarm interconnection, wired in during the same access rather than retrofitted

Doing them all in the one visit tends to work out cheaper than booking each separately down the track.

Call (02) 9538 7444
Electrician working on the wiring inside a switchboard

The Difference on a House Rewiring Job

A rewire done properly means new cable that will outlast the next renovation, not a patch that gets revisited in five years. We plan the job to protect finished surfaces wherever we can, and patch cleanly where we can't.

Every rewire also carries our lifetime workmanship guarantee, so the labour stands behind the job for good.

Communication matters more on a job this size than on a small repair. You'll know what's happening at each stage, not just at the start and the final invoice.

Wall plate wiring being repaired with a screwdriver

Servicing Nearby Homes Too

We handle full and partial rewiring across Ashfield and into Croydon, Summer Hill and Petersham. It's common to bring the board up to the same standard while walls are already open, and we'll happily quote both together.

The same crew that scopes the job also carries it out, from the first assessment through to the final test. Nobody's re-explaining the property to a different team halfway through.

Data cabling being terminated in a comms enclosure

Get in Touch Today for a Free Quote

Old wiring behind the walls, or planning a renovation properly? Ring (02) 9538 7444, or reach out online, and we'll assess the job and put a fixed price to you in writing.

Common questions

Your House Rewiring FAQs

Straight answers before you commit to a job this size.

Is my home too old for house rewiring?

No home is too old. Age is exactly why rewiring exists, and we've worked through plenty of properties older than yours.

Do you offer house rewiring in Ashfield on weekends?

Standard bookings run Monday to Friday. A rewire is planned work rather than an emergency, so weekday scheduling suits it best.

Is a permit or notification needed for house rewiring in NSW?

Rewiring is notifiable electrical work, so a Certificate of Compliance gets lodged with NSW Fair Trading once it's finished.

How long does house rewiring take?

A full house typically takes several days to a week or more, depending on size and access. A partial rewire is usually much quicker.

Can rewiring be done without turning off power all day?

Not entirely, since a full rewire needs the whole board isolated at points. We plan the work to minimise how long you're without power.

What warranty comes with house rewiring?

Our labour is guaranteed for life on every rewire, on top of the standard manufacturer warranty on materials used.